Operational readiness and airport transfer

ORAT is the work between construction handover and opening day. It readies people, procedures and systems together, through familiarisation, trials and a planned move into live operation.

Passengers walking through a bright airport terminal

The detailed scope on this page is published in English.

What we do

Readiness

  • ORAT programme set-up and governance
  • Readiness assessments and opening criteria
  • Concepts of operation and procedures for the new facility
  • Staff familiarisation and training

Trials

  • Systems integration and end to end testing
  • Operational trials with volunteer passengers
  • Baggage, security and border trials
  • Emergency and contingency exercises

Transfer

  • Move planning and day one command
  • Opening support and stabilisation
  • Post opening review

Typical deliverables

ORAT plans, readiness dashboards, trial programmes and reports, transfer plans and post opening reviews.

Applicable standards

ICAO Doc 9137 and Doc 9859, ACI and IATA practice and the client's own certification and security requirements.

Questions clients ask

When should ORAT start?

Ideally two to three years before opening, alongside detailed design, so operational requirements shape the building and its systems rather than being fitted afterwards.

How many trials are enough?

Enough to run every process end to end at peak volume with the staff who will operate it. For a large terminal that means dozens of trials over several months.