Air traffic management and CNS systems

CNS and ATM systems are the radio, navigation, radar and automation air traffic control depends on. We specify them, evaluate the tenders and stay with the client through acceptance to the night the new system takes live traffic.

Air traffic controllers working in a control tower

The detailed scope on this page is published in English.

What we do

Communication

  • VHF and UHF radio, voice communication systems and recorders
  • Controller pilot data link
  • Ground networks and resilience

Navigation

  • ILS, DVOR and DME
  • GNSS and augmentation
  • Navigation aid rationalisation as PBN takes over

Surveillance

  • Primary and secondary radar
  • ADS-B and multilateration
  • Surveillance data processing and fusion

Air traffic management

  • Area, approach and tower automation
  • Remote and digital towers
  • Air traffic flow management
  • Contingency centres and fallback

Through the lifecycle

  • Concept of operations and requirements
  • Specification and tender evaluation
  • Factory and site acceptance testing
  • Transition planning, parallel operation and cutover
  • ATSEP and controller training

Typical deliverables

Concepts of operation, requirement specifications, tender documents and evaluation reports, test plans and records, transition and cutover plans.

Applicable standards

ICAO Annex 10 Volumes I to V, Annex 11, Doc 9869 PBCS Manual, Doc 9882 ATM System Requirements, EUROCAE and EUROCONTROL specifications and ISO 11064 for control room design.

Questions clients ask

When does a remote tower make sense?

It suits airports with low or irregular traffic and groups of airports that can share controllers. The business case usually rests on staffing and on avoiding a tower rebuild and it depends on resilient data links.

Radar, multilateration or ADS-B?

Usually a mix. Radar works independently of the aircraft, multilateration performs well around airports and in difficult terrain and ADS-B is low cost on the ground but relies on aircraft equipage.

How is a new ATM system brought into service safely?

Through a transition plan agreed before contract award: shadow running, parallel operation, a fallback that is rehearsed and a cutover window chosen for the lowest traffic.

Speak to the team that will deliver your project.