Airport operations and A-CDM

Airport operations is how well the airport runs once it is built: turnarounds, shared information and recovery when something goes wrong. We implement A-CDM, design operations centres and write the procedures that hold it together.

Ground crew and a pushback tug at an airliner on the apron

The detailed scope on this page is published in English.

What we do

Collaborative operations

  • A-CDM gap analysis and implementation
  • Total airport management
  • Airport and integrated operations control centres
  • Network integration with the flow manager
  • Apron and airport operations control centre staffing and shift procedures

Operational performance

  • Turnaround and stand allocation
  • Passenger and baggage flow
  • Service level agreements and KPIs
  • Ground handling oversight
  • Movement area inspections and obstacle monitoring
  • Runway surface condition reporting in the Global Reporting Format
  • NOTAM, SNOWTAM and ATIS coordination with air traffic services
  • Airside works safety, permits and contractor control

Safety and resilience

  • Standard operating procedures
  • Low visibility and winter operations
  • Emergency planning and exercises
  • Wildlife hazard management
  • Aviation security
  • Rescue and firefighting category management
  • Aircraft de-icing and ice shedding procedures
  • Removal of disabled aircraft
  • Drone incident management at the aerodrome
  • Aircraft noise management with the surrounding community

Typical deliverables

Gap analyses, concepts of operation, procedures and manuals, KPI frameworks, exercise plans and performance reports.

Applicable standards

EUROCONTROL A-CDM Implementation Manual, ACI EUROPE APOC guidance, ICAO Doc 9971, Doc 9137, Doc 9981 PANS-Aerodromes, Doc 9365 Manual of All-Weather Operations, Annex 17, Regulation (EU) 139/2014 and IATA Airport Handling Manual.

Questions clients ask

What is A-CDM in one sentence?

The airport operator, airlines, handlers and air traffic control working from the same times for every flight, so aircraft wait at the stand rather than at the runway.

How long does an A-CDM implementation take?

Typically twelve to twenty four months. The software is the quicker part. Agreeing who owns each time and holding partners to it takes longer.

Speak to the team that will deliver your project.

Contact us